1st phase > foundation
forms in place ready to pour the concrete.
This include a special high accuracy level check on the foundation
forms. An general analysis of the foundation cable and rebar routing
is included.
2nd phase -> before the dry wall goes up. The
plumbing, some of the electrical, some of the HVAC should be
installed.
The bridging should have been applied and the walls ready for
the installation of the drywall covering.
Special attention is given to the very common errors of insufficient
wall support -bracing-bridging.
3 phase -> before the preliminary walk through.
The appliances should be in and all utilities turned on and working.
This would including the furnace, hot water heater and connections
to all the appliances including the cook top, microwave, vent fans,
dryer vents, dishwasher, oven and garbage disposal.
The quoted price is based on new construction with the preliminary
inspections performed.
Additional trips to the property as desired at minimum $250 each.
Optional equipment such as swimming pools, lawn
sprinklers, gas lines, and outbuildings have an extra charge.
You need to supply a phone number and the location with direction
from a major intersection (with a red light and on a current map).